STLLR Gold’s AI-Driven Drilling Yields 9.01 g/t Gold Over 19.0 Meters at Tower Project

Mar 31, 2025

STLLR Gold Inc. has reported significant infill drilling results at its Tower Gold Project in Ontario’s Timmins Mining Camp, utilizing artificial intelligence (AI) to optimize drill targeting. The drilling at the 903 Deposit intersected 9.01 grams per tonne (g/t) gold over 19.0 meters, including a high-grade segment of 124.50 g/t over 1.25 meters. Another hole yielded 1.30 g/t gold over 22.65 meters, with a subsection of 2.10 g/t over 11.50 meters. These results surpass the current Mineral Resource Estimate for the deposit, suggesting enhanced confidence in the resource model. President and CEO Keyvan Salehi emphasized that AI was instrumental in designing drill holes to efficiently convert mineralization into higher-confidence categories. The company has completed 3,500 meters of a planned 5,000-meter program and anticipates releasing further results upon completion. Additionally, STLLR Gold is on schedule to deliver an updated Mineral Resource Estimate and Preliminary Economic Assessment for the Tower Project in the first half of 2025. The Hollinger Tailings Project characterization program is also progressing, with assay results expected in the coming weeks.

READ PRESS RELEASE HERE