STLLR Gold Inc. reported additional assay results from its 2026 drilling program at the Jonpol Deposit within the Tower Gold Project in the Timmins mining camp, Ontario. The latest results returned 6.03 grams per tonne gold over 22.25 metres, including a higher-grade interval of 12.67 grams per tonne gold over 9.25 metres. A second interval returned 2.14 grams per tonne gold over 33.86 metres, including 14.89 grams per tonne gold over 2.33 metres.
These results continue to demonstrate strong continuity of gold mineralization along the western strike extension of the Jonpol deposit. The mineralization is hosted within structurally controlled alteration zones in mafic to ultramafic rocks, with gold associated with felsic intrusive bodies along the Munro Fault, a splay of the regional Destor-Porcupine Fault Zone.
The ongoing drill program is focused on expanding the open-pit mineralization footprint, which is currently defined over approximately 400 metres of strike length. The company is targeting potential expansion to about 1,200 metres while also completing infill drilling to support confidence in the geological model and future resource updates.
STLLR Gold indicated that results to date support the current geological interpretation and suggest the potential to grow higher-grade mineralization within the Jonpol system as drilling continues.

