McFarlane Lake Mining Advances Juby

Apr 29, 2026

McFarlane Lake Mining Limited is advancing its Juby Gold Project in Ontario with plans to update its mineral resource estimate and move forward with bulk sampling. The company is incorporating recent drilling results into a revised geological model, which will support the updated resource estimate.

Drilling at the Golden Lake area has outlined broad zones of gold mineralization over a significant strike length. Reported intercepts include 92 metres grading 0.95 grams per tonne gold and 208 metres grading 0.88 grams per tonne gold. These results support continuity of mineralization within the system and contribute to the ongoing resource update.

Two diamond drill rigs are active at the site, with additional assay results pending. Observations from drilling indicate consistent mineralization across multiple holes, including long intervals exceeding 100 metres. This work is aimed at strengthening confidence in the scale and geometry of the deposit.

In parallel, McFarlane Lake Mining Limited is preparing to extract a bulk sample of gold mineralization. This step is intended to support further technical evaluation and provide additional data for potential development planning.

Overall, the combined drilling, resource update, and bulk sampling efforts are focused on advancing the Juby Gold Project toward the next stage of evaluation.


READ MORE HERE