Brixton Hits 1,798 g/t Silver at Langis Project

Jun 16, 2026

Brixton Metals Corporation (TSX-V: BBB, OTCQX: BBBXF) announced on June 16, 2026 new high-grade silver drill results from its wholly owned Langis Silver Project in the historic Cobalt mining camp of Ontario, roughly 500 km north of Toronto.

Hole LM-26-342 in the Shaft 6 South (S6-S) area intersected 23.70 m of 206.6 g/t silver from 109.80 m depth, including 4.30 m of 905.6 g/t and 1.80 m of 1,329 g/t silver. In the adjacent Shaft 6 Southeast (S6-SE) area, hole LM-26-355 returned 4.95 m of 492.8 g/t silver from 146.10 m, including 1.00 m of 1,798 g/t silver, extending high-grade mineralization northward. Hole LM-26-348 cut 2.00 m of 624.0 g/t silver in the same area.

Drilling also identified disseminated silver mineralization alongside the typical vein-hosted mineralization, which CEO Gary Thompson noted is generally associated with bulk-tonnage potential. To date, 18,678.05 m across 90 holes have been completed in 2026; a second drill is now operating to meet the 60,000 m program target as Brixton works toward a maiden resource estimate. The project’s conceptual exploration target is 1.0 to 2.0 Mt at 400 to 800 g/t silver.