Kirkland Lake Discoveries Corp. has reported assay results from seven additional drill holes at its Mirado Gold Project, including high-grade gold in the South Zone and further expansion of the North Zone.
South Zone hole KLM26-022 intersected 20.29 grams per tonne gold over 4.4 metres from 177.6 to 182.0 metres. Hole KLM26-024, drilled as an 80-metre step-out, returned several mineralized intervals, including 0.32 grams per tonne gold over 29.9 metres, 1.33 grams per tonne gold over 18.0 metres, including 2.06 grams per tonne over 11.0 metres, and 0.20 grams per tonne gold over 36.0 metres.
Hole KLM26-021 returned 0.34 grams per tonne gold over 41.2 metres, followed by a deeper interval of 1.33 grams per tonne gold over 18.0 metres.
In the North Zone, hole KLM26-023 returned 2.27 grams per tonne gold over 9.1 metres, including 3.98 grams per tonne over 5.0 metres, plus 0.34 grams per tonne over 21.0 metres. Hole KLM26-025 returned 0.60 grams per tonne gold over 10.0 metres, including 1.64 grams per tonne over 3.3 metres.
Kirkland Lake Discoveries Corp. has also completed regional drilling at the MZ Zone and southwest of Mirado. Twenty-two additional holes are awaiting assays.

