STLLR Gold Inc. has reported additional assay results from its 2026 drilling program at the Jonpol Deposit on the Garrison Property of the Tower Gold Project in Ontario’s Timmins Mining Camp. The latest results continue to define near-surface, higher-grade gold mineralization while supporting the company’s objective of expanding and upgrading the deposit.
Highlighted results include 3.11 grams per tonne gold over 15.70 metres, 1.76 grams per tonne gold over 28.35 metres, and 1.47 grams per tonne gold over 29.00 metres. According to the company, several intercepts returned grades above the current average open-pit grades outlined for the Jonpol Deposit, supporting the potential to expand higher-grade mineralization.
STLLR Gold completed 8,536 metres of drilling during the first half of its 2026 program at Jonpol, with assay results still pending for the remaining drill holes. The drilling program is targeting two primary objectives: extending mineralization west of the current open-pit resource and infill drilling to confirm the geological model and support potential additions to the Tower Mineral Resource Estimate.
The company stated that successful drilling could expand the strike length of Jonpol’s open-pit mineralization from approximately 400 metres to 1,200 metres. The deposit remains open along strike and at depth. STLLR Gold also announced that director Angela Johnson has resigned from the Board of Directors.

