STLLR Gold Inc. (TSX: STLR) reported additional assay results on May 21, 2026 from its 2026 drilling program at the Jonpol Deposit, located on the Garrison Property at the eastern end of the Tower Gold Project in Ontario’s Timmins Mining Camp. Highlighted intercepts include 10.10 g/t gold over 5.57 metres, 2.55 g/t gold over 19.70 metres, and 3.37 g/t gold over 14.53 metres, all near surface.
The 2026 program calls for approximately 8,000 metres of drilling in the first half of the year, with two objectives: extending Jonpol’s open-pit mineralization westward from the currently defined 400-metre strike toward roughly 1,200 metres, and infill drilling to confirm the block model and support potential expansion of higher-grade mineralization in the Tower Mineral Resource Estimate.
Jonpol sits along the Munro Fault, a splay of the regional Destor-Porcupine Fault Zone, with mineralization hosted in structurally controlled alteration zones associated with felsic intrusive rocks. President and CEO Keyvan Salehi stated that the recent grades exceed current average open-pit grades at Jonpol and have the potential to enhance Tower’s production profile and overall project economics. Jonpol remains open along strike and at depth.
